I am looking to lay a pad for two vehicle lifts.
A 2 post & a 4 post.
Minimum size 7m by 7m & poss up to 7m x 10m.
I have only ever done small areas before.
A few questions.
Would you use rebar?
How thick? 4" meets the spec for the lifts.
Would you change how thick if you do / dont use rebar?
Is one slab better/ easier or would you fit each lift on its own slab?
How deep for the compacted base?
I am not sold on strands for strength but for small cracks they seem to have a place.
Would you agree?
If I have to span a 40mm stone filled in french drain would that be an issue?
Any tips?
A 2 post & a 4 post.
Minimum size 7m by 7m & poss up to 7m x 10m.
I have only ever done small areas before.
A few questions.
Would you use rebar?
How thick? 4" meets the spec for the lifts.
Would you change how thick if you do / dont use rebar?
Is one slab better/ easier or would you fit each lift on its own slab?
How deep for the compacted base?
I am not sold on strands for strength but for small cracks they seem to have a place.
Would you agree?
If I have to span a 40mm stone filled in french drain would that be an issue?
Any tips?