Just had a conservatory built, the windows went in today, but before that the rockwool in the cavity had two days of rain. I figured I would hook it out and put dry in before the cill goes on,its only a low wall 5mts-2.5mts, minus doorway.
Its not that damp now I've checked but I think he's made one roll go a long way.
It can be poked halfway down the wall.
I was going to just top it up, but then I thought, will I be packing it to tight, will I be bridging the damp course if he's only filled it from the dp up?
Any advice folks?