When rubbing down the epoxy have bare metal areas where we have rubbed through.
The data sheet says you can only Wet on Wet with a topcoat. For Dry on Dry wait 8-12 hrs to overcoat.
Do we have to rub down the epoxy again before overcoating with high build?
The data sheet says you can only Wet on Wet with a topcoat. For Dry on Dry wait 8-12 hrs to overcoat.
Do we have to rub down the epoxy again before overcoating with high build?