I can't see them taking 20 minutes each to turn and drill my self.
Maybe 10 mins to set up machine (maybe a shade over if the taper is critical), then ~5 mins each, plus another minute to drill and countersink each one.
Hour and a half should see a batch of 10 knocked out manually.