inchpincher
2-stroke terror
- Messages
- 471
- Location
- Tring, UK
Well I've practised loads since my introduction and finally got round to my vespa.  Removed the floor, sandblasted courtesy of advice on here then primed.  Added a new floor plus a little bit up the legshields.  Got to learn how to paint now 
		
		
	
	
		 
	
		 
	
		 
	
		 
	
		 
	
		 
	
		 
	
		 
	
		 
	
		 
	
				
			
 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	



 
 
		 ).  They needed careful chopping before welding together. Bit of fabricating add a tall weld to try to bridge the gap between the 0.7mm lights and the 2.5mm lammy frame.  Then what felt like 1000 spot welds.  Ground down then lead loaded.  This projects on hold till I can afford the paint job, lol.
 ).  They needed careful chopping before welding together. Bit of fabricating add a tall weld to try to bridge the gap between the 0.7mm lights and the 2.5mm lammy frame.  Then what felt like 1000 spot welds.  Ground down then lead loaded.  This projects on hold till I can afford the paint job, lol. 
	 
	 
	 
	 
	 
	 
	
 
 
		 ).
 ). 
 
		 
 
		
 
 
		 
 
		 
 
		 
 
		 
 
		
