I thought I would put this in the automotive thread as 99.9% of my stuff is car/bike related and it will be neater all in one thread.
Today's job was 2.5" stainless mid-pipe for a Mazda Eunos(MX5)
It was pikey cut and welded as it was for a mate and he didn't want to pay for any bends.
Flanges welded up before hand.
After a few trips backwards and forward I had a complete pipe welded up.
Bolted up and ready for action.
(Pardon all the surface rust, it isn't half as bad as it looks in the pics)
Today's job was 2.5" stainless mid-pipe for a Mazda Eunos(MX5)
It was pikey cut and welded as it was for a mate and he didn't want to pay for any bends.
Flanges welded up before hand.

After a few trips backwards and forward I had a complete pipe welded up.

Bolted up and ready for action.

(Pardon all the surface rust, it isn't half as bad as it looks in the pics)